Park Location

Apaseo, Guanajuato

Advantages

  • Airport At one hour drive
  • Highways to: Gto, Qro, México City, Monterrey, NAFTA Hwy & 45 Hwy.
  • 24/7 Controlled access: Fenced and Gated.
  • Use: Manufacturing, Assembly & Distribution.
  • Transportation: Public.
  • Infrastructure: All on site. The Best Available.
  • Labor Force: Abundant. Nearby. Easy Access.

Distance To

  • Qro Intercontinental Airport 54 km = 34 miles
  • Queretaro 24 km = 15 miles
  • México City 234 km = 145 miles
  • Monterrey 714 km = 444 miles
  • Saltillo / Ramos Arizpe 647 km = 402 miles
  • Mc Allen TX / Reynosa City 887 km = 551 miles

Park Infrastructure

  • Water
  • Sewer
  • Telephone Lines
  • Energy
  • CCTV

General Layout View

SPEC A – VAIP

Building Information

  • Initial Land Area (10,370.70 m² / 111,629.15 Sq.Ft.)
  • Initial Building Area (5,035.04 m² / 54,196.70 Sq. Ft.)
  • Expansion Land Area (6,449.46 m² / 69,421.34 Sq.Ft.)
  • Expansion Building Area (4,154.46 m² / 44,718.19 Sq.Ft.)
  • Substation: According to client needs
  • Parking Lot: 38 Spaces
  • Building Size: 61.81 m x 81.46 m
  • Building Structure: Steel Rigid Frame
  • Wall Material:Pre-cast Concrete
  • Roof Material:Standing Seam Roof
  • Clear Height Min. 9.14 m / 30′
  • Docks: 3 + 2 Docks
  • Ramp: 1 Concrete Ramp
  • Floor Thickness 6″ / 15 cm
  • Skylights 5% Approx.